Follow up for IDEMPIERE-3742 Wrong product cost for partial MR

Description

The fix for failed with the following configuration:

  • Accounting Schema Costing Method is Standard Costing

  • Product's product category costing method is Average Costing

In other words, the fix committed for doesn't work when the effective costing method of a product is Avearge Costing and is different from the Accounting Schema's Costing Method.

Environment

None

Assignee

Heng Sin Low

Reporter

Heng Sin Low

Labels

None

Tested By

None

Components

Fix versions

Priority

Major
Configure